The Phoenix area became a chip centre when Motorola opened a semiconductor lab there in 1949. Intel has made chips in Chandler since 1980, and its Fab 52 began making 18A chips in 2025. TSMC broke ground on its first Arizona fab in north Phoenix in 2021 and began volume production on its 4 nm class process at the end of 2024. Microchip Technology has its headquarters in Chandler.
TSMC Arizona
TSMC Arizona is the largest foreign direct investment in US history: in March 2025 TSMC raised its planned total to 165 billion US dollars, covering six fabs, packaging and research. The US CHIPS Act granted it 6.6 billion dollars. In October 2025 Nvidia and TSMC showed the first Blackwell wafer made in the United States. Labour disputes and costs slowed the early build.
Intel Ocotillo
Intel's Ocotillo campus in Chandler holds several fabs. Fab 52, the first for Intel's 18A process, which uses gate-all-around transistors and backside power delivery, began production in 2025 with Panther Lake laptop chips. Arizona's dry climate raises questions about water; Intel and TSMC say they treat and reuse most of the water they use.
Chips of Phoenix and Chandler
Also tied to Phoenix and Chandler
Photo credits on this page
The small pictures above come from Wikimedia Commons under free licences. Some are cropped to fit.
- Panther Lake: 极客湾Geekerwan, CC BY 3.0, source
- PIC microcontroller: Raimond Spekking, CC BY-SA 4.0, source
- MC14500B: JPL, CC BY-SA 4.0, source
- Blackwell: 极客湾Geekerwan, CC BY 3.0, source