Meteor Lake
Intel's first chiplet-based mobile Core Ultra processors, launched December 2023
Meteor Lake is the codename for Intel's first generation of Core Ultra Series 1 mobile processors, officially released on 14 December 2023. It was the first Intel mobile processor built as a multi-chip module, combining separate tiles for compute, graphics, I/O and a base interposer, made across Intel 4 and TSMC nodes.
- First Intel mobile processor built as a multi-chip module of separate tiles
- Compute tile on Intel 4, Intel's first node using EUV lithography
- Two low-power Crestmont cores on the SoC tile let the main compute tile switch off
- Up to 8 Xe-LPG graphics cores with ray tracing units, boost above 2.0 GHz
- Launched 14 December 2023 as first-generation Core Ultra
What it is
Meteor Lake is the codename behind Intel's Core Ultra Series 1 mobile processors, which went on sale on 14 December 2023. It is a 64-bit x86 design aimed at laptops and built for low power use. The notable point is the packaging: instead of one large slab of silicon, the chip is a multi-chip module made of separate tiles for computing, graphics, system functions and a base that links them. Intel designed it, with the compute tile made on its own Intel 4 process and other tiles outsourced to TSMC. Tim Wilson led the design effort.
How it came about
Intel first talked about Meteor Lake in July 2021, promising a 5-125 W range covering ultra-low-power mobile through to enthusiast desktop. The initial tape-in happened in May 2021, and by October that year the compute tile had taped out and powered on within 30 minutes of arrival. A complete mobile part powered on in April 2022. Desktop plans were cut back in March 2023, and the design was shown publicly at Intel's Innovation event in September 2023 before the December launch.
Inside the chip
The chip splits work across tiles. Up to 6 Redwood Cove performance cores handle heavy threads, each with two threads per core, while 8 Crestmont efficiency cores run in two clusters of four with shared cache. Two more Crestmont cores sit on the SoC tile as a low-power island, running at up to 2.5 GHz so background tasks can keep going while the main compute tile sleeps. Cache is 112 KB per P-core, 96 KB per E-core, 2 MB of L2 per core or cluster, and up to 24 MB of L3. The graphics tile holds up to 8 Xe-LPG cores with ray tracing units, and an NPU adds AI acceleration.
How it was made
Four process nodes are used. The CPU compute tile is built on Intel 4, Intel's first node with extreme ultraviolet lithography, at the D1D plant in Hillsboro, Oregon, which Intel says can output 40,000 wafers a month. High-volume production also runs at Fab 34 in Ireland. TSMC in Taiwan makes the graphics tile on N5, and the SoC and I/O tiles on N6. A base interposer tile uses Intel's 22FFL process to link the tiles. The compute tile measures about 8.9 mm by 8.3 mm, giving roughly 730 dies per 300 mm wafer.
Where it went
Meteor Lake is a mobile part, going into laptops where battery life matters. Intel also said some versions would reach desktop in 2024, but only in BGA form inside compact all-in-one machines, not as socketed chips for DIY builds. The SoC tile carries Wi-Fi 6E and Wi-Fi 7, Bluetooth 5.4, USB4 and up to four Thunderbolt 4 ports, and the media engine can drive four 4K 60 Hz HDR displays or one 8K HDR screen. Dell documentation noted that at least 16 GB of dual-channel memory is needed for the full Arc graphics branding.
Versions and family
The range covers Core 3, 5 and 7 parts alongside premium Core Ultra 5, 7 and 9 models, all counted as first-generation Core Ultra. Configurations offer 2 to 6 P-cores with 8 E-cores and 2 low-power E-cores. A desktop line, Meteor Lake-S, was designed for the LGA 1851 socket with 6 P-cores and 16 E-cores but was cancelled in March 2023, delaying that socket until Arrow Lake. Arrow Lake and Lunar Lake follow Meteor Lake.
Why it matters
Meteor Lake marked Intel's move to a disaggregated multi-chip module for client CPUs, a step that improves yield by using small dies and lets each function sit on a process node suited to it. Intel claimed a 20% power efficiency gain for Intel 4 over Intel 7, and twice the logic density. The graphics tile brought a claimed 2x performance-per-watt jump over Iris Xe, boost clocks above 2.0 GHz, DirectX 12 Ultimate and XeSS support. The launch also introduced the Core Ultra name after more than 15 years of Core i branding.
Problems and reception
The new Core and Core Ultra naming drew criticism. Josh Loeffler of TechRadar found the split between Core and Core Ultra confusing, since Core 5 and 7 sit alongside Core Ultra 5 and 7. Digital Trends argued the scheme copied AMD and Apple rather than leading. Independent testing of the Redwood Cove P-cores showed a drop in single-thread IPC against the older Raptor Cove design. The graphics tile also shipped with 128 Xe Vector Engines rather than the 192 shown in an early 2021 slide.




Questions people ask about Meteor Lake
What is Meteor Lake?
It is the codename for Intel's Core Ultra Series 1 mobile processors, released on 14 December 2023. The design splits the chip into separate tiles for computing, graphics and system functions, joined on a base tile, rather than using one large piece of silicon.
Who makes it and where?
Intel designed it and builds the compute tile on its Intel 4 process at D1D in Hillsboro, Oregon, with high-volume production also at Fab 34 in Ireland. TSMC in Taiwan makes the graphics tile on N5 and the SoC and I/O tiles on N6.
What is the low-power island?
It is a pair of Crestmont efficiency cores placed on the SoC tile, capped at 2.5 GHz. They take background work while a laptop idles or sleeps, letting the main compute tile switch off to save battery. Intel Thread Director sends work there first, then to the compute tile E-cores, then the P-cores.
Why did Intel split the chip into tiles?
Smaller dies fit more per wafer and raise yield, and each tile can use a process node that suits it. I/O and SRAM do not shrink as well as logic, so those tiles can use cheaper, mature nodes while the CPU tile uses a more advanced one.
Did Meteor Lake come to desktop?
A desktop version, Meteor Lake-S, was planned for the LGA 1851 socket but was cancelled in March 2023. Some parts do reach desktop in 2024, but only in BGA form inside compact all-in-one PCs, not as socketed chips for self-built machines.
Good reading and sources
- 6 ways Intel's 14th-gen 'Meteor Lake' CPUs supercharge laptopsPCWorld, Article
- Checking your browserAnandTech, Article
- Intel Core Ultra Ushers in the Age of the AI PCIntel, Article
- Intel Teases 14th-Gen Meteor Lake CPUs With Tile Design and 192 EUsTom's Hardware, Article
The facts on this page come from the Wikipedia article "Meteor Lake", written by its contributors and used under the CC BY-SA 4.0 licence, and from its Wikidata record (CC0). EveryChip rewrote the text in its own words, with AI assistance, and compares every page with the article to make sure no passage is copied. It may be reused under the same CC BY-SA 4.0 licence with a link back.
It may contain mistakes, and figures change over time. Nothing here is investment or buying advice. If something is wrong, tell us. Last refreshed 2026-11-14.
Like Meteor Lake
All CPUs and microprocessors
🇺🇸 United StatesApple M3
Apple's 3 nm Mac and iPad SoC family with CPU, GPU and Neural EngineSoC · Arm · 2023